Portobello RMF successfully completed the design and build of an ASME U-Stamped Electrolytic Tank and Skid Module, with Super Duplex tank and pipework on a carbon steel skid.


Project Details

Our scope covered the full design, fabrication, assembly and testing of the tank, pipework and skid as a single integrated module.

Scope of Supply

Electrolytic Tank & Skid Module

Design Code

ASME VIII Div 1 (U-Stamp)

Welding Code

ASME IX

Size

700mm Diameter x 3100mm Overall Length (Full Assembly)

Weight

1,654 KG

Materials

Tank/ Pipework: Super Duplex | Skid Assembly: Carbon Steel

Year Manufactured

2025

Key Challenges

Delivering the tank under ASME U-Stamp certification required full Authorised Inspector involvement at each stage. Super Duplex welding demanded tight control of heat input and interpass temperature to maintain the correct phase balance and corrosion resistance. Super Duplex and carbon steel work were kept fully segregated, before the tank, pipework and skid were brought together as one complete, ready to install module.

This project demonstrates our ASME U-Stamp capability and our ability to deliver fully integrated skid packages in high performance materials.